Coventry Traffic Signals along Hwy. 6 at "Q" Street and Harrison Street, Omaha, NE
Client: CFM Realty Project Size: 2 traffic signals Construction Cost: $138,000 Highway 6 and George B. Lake Boulevard Project Duration: 4 months
Results: Installation of traffic signals at the intersection of Highway 6 and George B. Lake Boulevard and design of traffic signals for the intersection of Highway 6 and Harrison Street.
E&A's Project Scope: Prepared plans, specifications and cost estimates for two new traffic signals, street lighting, signal interconnect and signing.